Land developer Ortigas & Company has started redeveloping its Frontera Verde, which is now renamed Ortigas East, property along Ortigas Avenue and Julia Vargas Avenue into a new estate which it envisions as a natural extension to the Ortigas Central Business District base.
The redevelopment will be broken down into 3 phases spread over 15 to 20 years.
The redevelopment will be broken down into 3 phases spread over 15 to 20 years.
The 16-hectare estate will have residential and commercial components. The Ortigas & Company had also noted that they will set aside 40% of the total property to open spaces such as parks and roads, including a 6-lane boulevard for vehicles and bicycles.
The Glaston Tower, first office tower to rise in Ortigas East is the first redevelopment plan conceived under the synergy of Ortigas & Company, Ayala Land, and SM Prime. The estate aims to seamlessly integrate a modern, bustling community with a lifestyle grounded on accessibility, community, and sustainability.
The Glaston Tower is set to provide office spaces for tech startups and more established, traditional businesses such as consulting and trading companies, law firms, and financial corporations.
The Glaston Tower, first office tower to rise in Ortigas East is the first redevelopment plan conceived under the synergy of Ortigas & Company, Ayala Land, and SM Prime. The estate aims to seamlessly integrate a modern, bustling community with a lifestyle grounded on accessibility, community, and sustainability.
The Glaston Tower is set to provide office spaces for tech startups and more established, traditional businesses such as consulting and trading companies, law firms, and financial corporations.
The Glaston Tower is a 34-storey office building that proves the strong demand for office supply in Ortigas area. It is undergoing LEED certification, and will be built to capture its vision of a balanced space where office workers can be both relaxed and productive.
Tower Specifications:
Typical Office Floor Plate: 1,990 sq.m.
Building Grade: A
Total number of Floors: 34 (25 levels for Office Floors)
Number of Units per Floor: 14 units
Total number of Units: 349 Office, 7 Retail, 108 Storage Facility
Total number of Parking Levels: 8 levels of podium parking
2 levels of basement parking
Total number of Parking slots: 611 preassigned
Number of Elevators: 12 Passenger
The Glaston Tower will also have 7 retail establishments , while being connected to a new regional mall through a sky lobby located in the tower’s upper level.
It Offers:
Approximate price: Php194K/sq.m.
Prices are subject to change without prior notice.
Turn over: 3Q 2022
Tower Specifications:
Typical Office Floor Plate: 1,990 sq.m.
Building Grade: A
Total number of Floors: 34 (25 levels for Office Floors)
Number of Units per Floor: 14 units
Total number of Units: 349 Office, 7 Retail, 108 Storage Facility
Total number of Parking Levels: 8 levels of podium parking
2 levels of basement parking
Total number of Parking slots: 611 preassigned
Number of Elevators: 12 Passenger
The Glaston Tower will also have 7 retail establishments , while being connected to a new regional mall through a sky lobby located in the tower’s upper level.
It Offers:
- Prime unit: 77.88 – 101.88 sq.m. @ Php15.4 – 26M
- Glass unit: 76.88 – 101.88 sq.m. @ Php16.6 – 24M
- Prime Suite: 123.88 -132.88 sq.m. @ Php 25.3 – 29.5M
- Glass Suite: 123.88 -141.88 sq.m. @ Php 27.8 – 33M
- Retail 40.26 - 113.02 sq.m.
Approximate price: Php194K/sq.m.
Prices are subject to change without prior notice.
Turn over: 3Q 2022